NASA has already launched phase 1 of construction of your moon base. They have not yet taken a new batch of humans to the Moon, but it is important to prepare the ground, which is why this Tuesday they announced the first steps they are taking to do so. And, as it could not be otherwise, it all starts with million-dollar hires.
6 companies in total. At the moment, NASA has invested hundreds of millions of dollars in hiring six companies that will be in charge of developing the technologies necessary to launch the first phase of the lunar base. The companies in question are Blue Origin, Astrobotic, Intuitive Machines, Astrolab, Lunar Outpost and Firefly Aerospace. In general, in this first phase of construction of the lunar base it is expected to explore the south polar region, test various technologies and prepare surface operations. All of this will be carried out through 25 missions that will include 21 moon landings.
Moon Base 1. To begin with, the first three missions are expected to launch this year. The first, Moon Base 1, will be carried out by Blue Origin. Jeff Bezos’ company will take its lander to the Moon Blue Moon Mark 1the “brother” of the Blue Moon Mark 2 that is preparing to become the human landing system for the Artemis missions.
As payload will include the Stereoscopic Cameras for Lunar Plume-Surface Studies to study how thrusters interact with the lunar surface, and the Laser Retroreflective Array, which helps spacecraft in orbit determine a more precise location using reflected laser light. The mission will take place in autumn 2026 if all goes well. Since it will be the first to land in the Shackleton crater, where the base is to be built, it will also be in charge of checking the viability of lunar landings near the lunar base.
Moon Base 2. The second mission, which will also travel to the Moon at the end of 2026, will be carried out by Astrobotic. It will send its Griffin lander to the Moon, loaded with 500 kg of instrumentation, including a rover to study the surface on which the base will be built and mature the mobility systems for future manned vehicles.
Moon Base 3. The third mission to be sent in 2026 has been granted to Intuitive Machines. This company will take its Nova-C Trinity lunar module there, which will be in charge of studying lunar eddies and the behavior of materials under extreme conditions. Furthermore, this mission will not be 100% private, as it will include payloads from the European Space Agency and the Korean Institute of Astronomy and Space Sciences.

Some of the models that NASA showed during the press conference
Boogies to move around the Moon. So that future astronauts who travel to the lunar base can move around it, they want to take two manned lunar vehicles there. Said so that we can all understand each other, two boogie-type strollers, designed to move around the lunar surface, both with and without a crew. Its development has been entrusted to the companies Astrolab and Lunar Outpost, also as part of this first phase.
Delimitation drones. The company Firefly Aerospace has been entrusted with taking the 4 Moonfall drones to the Moon, whose main mission will be to inspect the area in search of the best landing places for the astronauts. Although they will also have a much more peculiar mission. As explained At NASA’s press conference, its executive director of the lunar base program, Carlos García-Galan, these drones will also be stationed in the corners to delimit the perimeter of the lunar base.
Next phases. This first phase will last until 2029. Then the next phase will begin, which will end in 2032. In this, the permanent infrastructure of the lunar base will begin to be built, including electrical installation. From then on, it will only be necessary to refine more and more details and little by little receive the astronauts of the Artemis missions of the future. Without a doubt, this is the beginning of a new era of space exploration.
Image | POT
In Xataka | We knew there was water on the Moon, but not why some craters were empty. Finally we have the answer

GIPHY App Key not set. Please check settings