the plan to turn Asturias into the great energy shipyard that Europe no longer knows how to build

For decades, the West operated under a mirage: believing that making things was no longer relevant and that the future lay only in software. However, China has woken up Europe of that dream, showing him that national sovereignty depends, ultimately, on knowing how to melt metal. Now that “bath of reality” has just docked in Asturias.

The Port of Gijón, El Musel, has ceased to be just a strategic enclave for local coal and steel to become the epicenter of a global ambition. The Asturian group Zima and the Chinese giant Dajin Offshore they have sealed an alliance to build a foundation plant for offshore wind. However, there is a problem and size does matter, a lot.

The landing of a colossus. Dajin and Zima have signed a Memorandum of Understanding (MoU) to develop a facility that will not only manufacture components, but will function as a port for marshalling —the logistics area where these pieces are collected and pre-assembled—. As detailed in The Economistthe objective is to supply the European market and alleviate bottlenecks in the sector.

Dajin is not just any actor. As detailed in local media, It is the largest Chinese private manufacturer of offshore wind structures. This alliance will reinforce the strategic role of the region in the European energy transition.

The Gordian knot: the crisis of space. Zima’s initial project occupied 153,753 square meters on the North Pier. However, the entry of Dajin changes everything: the multinational need more space. Making XXL “monopiles” is not like making cars. According to technical data provided by Energetica21Dajin has the capacity to manufacture structures up to 12 meters in diameter, 120 meters in length and 2,500 tons in weight. “Moving and storing these steel cylinders requires massive esplanades that are currently compromised,” warn industry sources. in LNE.

El Musel finds himself facing a puzzle. The land requested by Zima borders Ionway’s future battery plant. As LNE explainsthe Port Authority is studying with “the best disposition” how to meet this demand, either by extending towards the sea or looking for non-contiguous plots.

An “Electrostate” in the Cantabrian Sea. To understand this project you have to look at the global context. Today, China builds 74% of the planet’s renewable energy. By settling in Gijón, Dajin brings what the West has lost: heavy industrial capacity. As Miquel Zorita, director of Zima, points out, in The Economistthe desire is to integrate local suppliers. This is vital because European wind turbine manufacturers such as Siemens Gamesa or Vestas are going through a deep profitability crisis. Chinese technology in Asturias could be the necessary oxygen ball, even if it is under a foreign flag.

The industrial clock against the bureaucratic clock. The success of this operation will not be measured only in the millions of euros of investment or in the jobs created, but in the size of the facilities it will depend exclusively on the space they obtain in the port. Asturias has before it the opportunity to stop being a “quarry” of resources and become a center of high added value. But, as Craig Tindale’s thesis warnsa civilization that sacrifices its material base ends up losing its independence. Gijón is redesigning its map; Now it remains to be seen if El Musel has enough soil to support so much weight.

Image | Bafpg and ShellAsp

Xataka | Inspecting an offshore wind turbine no longer requires stopping it: the drone that uses AI to ‘x-ray’ moving blades

Leave your vote

Leave a Comment

GIPHY App Key not set. Please check settings

Log In

Forgot password?

Forgot password?

Enter your account data and we will send you a link to reset your password.

Your password reset link appears to be invalid or expired.

Log in

Privacy Policy

Add to Collection

No Collections

Here you'll find all collections you've created before.