Saudi Arabia is facing a fiscal deficit Due to the expensive investments in projects such as The Line, which are part of their 2030 vision to diversify its economy. However, one part compensates for another, and that is that the Saudi country is focused in covering everything with solar panelsbut it has not taken into account until now where it could store energy.
Short. Saudi Arabia has officially connected the largest energy storage system (Bess) in the world in Bisha, province of ‘Asir. The project has achieved a milestone in the country’s strategy due to a 500 MW/2000 MWh battery system. The operating company is Saudi Electric Company and uses advanced technology supplied by ByD.
A larger initiative. The project, called Bisha Bess, is part of a broader initiative of the Arab country to further strengthen your renewable energy infrastructure. The nation is looking for more than half of its energy to come from renewable energiesso you have seen in storage the necessary component for this transition. Saudi Arabia has found that the batteries provide flexibility to the network and allows the integration of intermittent energy sources such as solar and wind.
Apart from being part of the National Vision 2030 Plan, Bisha Bess is part of different large -scale storage initiatives. In an ongoing tender, the list of 33 prequalified bidders was published in early January and revealed that Masdar, Acwa Power, EDF and Totalenergies compete for 15 -year storage service contracts.
122 storage units. The Chinese company byd have prefabricated the 122 units, each integrates a 6MW energy conversion system (PCs) along with four iron and lithium phosphate batteries (LFP) batteries, each with a capacity of 5,365MWH. The design is modular to optimize space, improve system integration and minimize failure points.
Desert construction. Although the batteries were supplied by the Chinese company byd, the project was carried out by a consortium formed by State Grid Corporation of China and Alfanar Projectswho were in charge of engineering, equipment acquisition and installation construction. The installation, located in an extremely challenging desert environment, has presented significant difficulties, such as high temperatures and frequent sand storms. To deal with these obstacles, the engineers perfected the installation techniques and optimized the start -up processes, ensuring the reliability of the long -term system.
If you can’t with them, join them. This famous phrase can be attributed to the Saudi kingdom, who has thought about China. At the time he began to enter this race for the renewables, Arabia Saudi began to great. However, in the field of Megaestructures and renewablethe Asian giant has no rival. Although the Arab country is developing different projects in renewables, others that also integrate clean sources such as the city of Neom, is not having the expected success. However, there is a sector where you could compete with China: nuclear energy. The kingdom has the ability to Extract and process Uranium, which would position him as a key actor.
Image | Red Sea Project SA